SUB-PROJECT: CNCAN 7

SUB-PROJECT: CNCAN 7

Enhancing CNCAN capabilities in the field of the regulation of radioactive waste management, spent nuclear fuel management and decommissioning activities

 

  • Activity A7.1: Development of a new regulation (norms) on the predisposal management of radioactive waste

 

Results:

- Norms on the predisposal management of radioactive waste, including safety criteria, criteria for safety assessments and the licensing procedure

- Procurement of one laptop

 

  • Activity A7.2: Development of a methodology for the verification of safety assessments and of other technical documents required in the licensing and inspection process for predisposal management activities.

 

Results:

- The methodology for the verification of safety assessments for the predisposal management of radioactive waste

- Procurement of one laptop

 

  • Activity A7.3: Revision of the existing regulation on the disposal of radioactive waste on the basis of the IAEA recommendations, as well as implementation of the reference levels developed by the WENRA working group WGWD.

 

Results:

- Norms on the disposal of radioactive waste, including safety criteria, safety assessment criteria and the licensing procedure

- Procurement of one laptop

 

  • Activity A7.4: Development of a standard review plan describing the detailed criteria and the procedure for assessment and verification by the regulatory authority, as well as development of the checklist for each phase of the lifetime of radioactive waste disposal facilities

 

Results :

- The standard review plan, describing the detailed criteria and the procedure for assessment by the regulatory authority

 

  • Activity A7.5: Participation in technical meetings organized by the IAEA

 

Results:

- Working reports

 

  • Activity A7.6: Revision of the existing regulations concerning the safety requirements for the decommissioning of nuclear installations and large radiological installations, based on the IAEA recommendations, as well as implementation of the reference levels developed by the WENRA working group WGRW

 

Results:

- Norms on the safety requirements for the decommissioning of nuclear installations and large radiological installations;

- Procurement of one laptop;

 

  • Activity A7.7: Development of the methodology for the assessment of the decommissioning plan and of the application for a decommissioning licence

 

Results:

- A methodology for the assessment and verification of the decommissioning plan for nuclear installations and for the main radiological installations

 

  • Activity A7.8: National workshop on NORM

 

Results:

- The workshop report, containing the gaps identified in the regulations, the stakeholders and their responsibilities

  • Activity A7.9: Development of the radiological safety requirements and of the authorization procedure for NORM

 

Results:

- Norms on the radiological safety requirements for natural sources

 

  • Activity A7.10: Development of the methodology for the review and assessment of the report on safety requirements, as well as of the checklist used during inspections of natural sources

 

Results:

- Methodology for the review and assessment of the report on safety requirements, as well as of the checklist used during inspections of natural sources

 

 